Residential Solar Solutions

Get a Quote For Your Project

About this Process

Our job is to keep this process as easy as possible for you.

 

Quote & Contract

Our sales team can assist you with what size system will work for your home & lifestyle based on your budget.

Connect application to the Grid

We manage & submit a connect application to the distributor on your behalf, once approved we can schedule your installation.

Installation Day

Our install teams are all certified and Clean Energy Council acredited, our teams know the regulations outlined for installs and adhere to them.

Retailer final meter connect

Your electricity provider is the (retailer) they will recieve notice when the installs is completed. A scheduled time for a meter change will be issued if necessary.

Start saving

 

Call For a Quote:

1300 459 315

F.A.Q.S

BEFORE YOU DECIDE TO INVEST IN SOLAR, IT’S IMPORTANT TO DO YOUR RESEARCH SO YOU KNOW WHAT WILL WORK FOR YOU. THINK ABOUT WHAT TYPE OF SYSTEM YOU WANT TO INSTALL, HOW MUCH YOU WANT TO SPEND AND WHAT GOVERNMENT SUBSIDIES YOU MIGHT BE ELIGIBLE FOR

How many panels can I fit on my roof?

As much as you reasonably can.

Within what is allowed & practical.

The size of your solar PV system will depend on:

• what portion of your electrical consumption you wish to generate

• the physical unshaded area available for the installation of your panels

• how much you are prepared to spend

How long does the connect application process take?

CONNECTING YOUR SOLAR PV SYSTEM TO THE GRID IS A TWO-STEP PROCESS THAT INVOLVES:

1. making an application to connect your system prior to installation (where required)

Dependant on your inverter size. A 5KW inverter can be approved in 24-48hours. Anything over a 5KW inverter will need to go through an evaluation process and can take up to 65 working days.

2. a meter change/reconfiguration and connection to the grid. 

Who does the meter change?

Your existing meter may need to be reconfigured or replaced by a new import/ export meter before you can connect to the grid, especially if it is an older home. This may need to occur before or after installation, depending on the requirements in your state.

If your home is a NEW build, the new meter style will already be fitted.

Your solar retailer will need to be notified to organise a meter change/reconfiguration.

 

What extra costs should I consider?

Extra costs to be aware of that might not be included in your initial quote:

• meter change or reconfiguration

• upgrades to your switchboard or cabling

• removal of trees or other shading

• site preparation needs (for example, condition of roof or ground)

What are STC's

Government incentives in the form of Small-scale Technology Certificates (STCs) to help reduce the upfront cost of installing your solar PV system.

STCs are an electronic form of currency and are allocated to you when you install a solar PV system.

One STC is equivalent to one megawatt-hour of electricity generated by your solar PV system.

The price of STCs changes according to market conditions.

The total level of subsidy you receive will depend on a number of factors, including the location and size of the solar PV system and the price of STCs at the time the system was installed.

There are two ways you can be paid for your STCs:

1. Assign your STCs when you purchase your solar PV system to a registered agent in exchange for a financial benefit, which may be in the form of a delayed cash payment or upfront discount on your solar PV system (most consumers take this option, and your solar retailer will usually make the arrangements on your behalf), or

2. Create the STCs yourself by finding a buyer and then selling and transferring them in the Renewable Energy Certificate (REC) Registry.